Annex 2 - CEB Fees
Interconnection facility and cost
The MSDG will be connected to CEB 22kV network through a dedicated 22/0.415 kV distribution transformer and metered on the low-voltage side as per schematics shown in Figure 1 of this Code.
In addition, the applicant shall bear fees for processing applications and preparation of cost estimate for network construction or modification. The list of fees is available on CEB website.
In the absence of a dedicated transformer, CEB will consider the applications on a case-to-case basis.
Note:
For the most current fee structure and detailed breakdown of costs, applicants are advised to:
- Visit the official CEB website
- Contact the SSDG-MSDG Unit at CEB Curepipe
- Request the latest fee schedule during the application process
Typical Fees and Charges
Applicants should be prepared for the following types of fees and charges:
- Processing Fee: Initial application processing and administrative costs
- Connection Fee: For establishing the physical connection to the grid
- Network Reconstruction Costs: If network modifications are required
- Testing Fees: For CT testing and commissioning
- Metering Equipment: Cost of meters, modems, and communication charges
- Reconnection Fees: Applicable in case of disconnection and subsequent reconnection
Important Information
All fees must be settled at the CEB Cash Office as per the timeline specified in the connection process. Failure to settle fees within the stipulated timeframe may result in cancellation of the application.