MSDG.MU
  • Home
    • 50 kW - 200 kW
    • 200 kW - 2 MW
  • Contact
  • EN | FR
×

Request your free technical study

Sending your request...

* Our team will contact you within 48 hours

Annex 4: Certificate of Installation

Applicant/installer to submit duly signed certificate (as shown below), with the Company's header and seal, to the CEB. The MSDG installation shall be certified by a Registered Professional Engineer (CRPE Mauritius).

← Previous: Annex 3 Next: Annex 5 →

TABLE OF CONTENTS

  • Home
  • Chapter 1 - Purpose of Grid Code
  • Chapter 2 - Connecting MSDG to the Grid
  • Chapter 3 - Interconnection Requirements
    • Part 1 (3.1-3.6.1)
    • Part 2 (3.6.2-3.8)
    • Part 3 (3.9-3.12)
    • Part 4 (3.13-3.14)
    • Part 5 (3.15-3.18)
  • Chapter 4 - Operating Characteristics
  • Chapter 4 - Operating Characteristics (Enhanced)
  • Chapter 5 - Testing & Commissioning
  • Chapter 6 - Compliance with Code
  • Annex 1: Abbreviations & Definitions
  • Annex 2: Certificat de Consignation
  • Annex 3: CEB Fees
  • Annex 4: Certificate of Installation
  • Annex 5: Certificate of Compliance
  • Annex 6: Switchgear Arrangement
  • Annex 7: Interconnection Facility
    • Part 1: General & Scope
    • Part 2: Protection & Communication
    • Part 3: Transformers & Forms
  • Annex 8: HV Switchgear Panels
  • Annex 9: Communication Requirements

TABLE OF CONTENTS

  • Home
  • Chapter 1 - Purpose of Grid Code
  • Chapter 2 - Connecting MSDG to the Grid
  • Chapter 3 - Interconnection Requirements
    • Part 1 (3.1-3.6.1)
    • Part 2 (3.6.2-3.8)
    • Part 3 (3.9-3.12)
    • Part 4 (3.13-3.14)
    • Part 5 (3.15-3.18)
  • Chapter 4 - Operating Characteristics
  • Chapter 4 - Operating Characteristics (Enhanced)
  • Chapter 5 - Testing & Commissioning
  • Chapter 6 - Compliance with Code
  • Annex 1: Abbreviations & Definitions
  • Annex 2: Certificat de Consignation
  • Annex 3: CEB Fees
  • Annex 4: Certificate of Installation
  • Annex 5: Certificate of Compliance
  • Annex 6: Switchgear Arrangement
  • Annex 7: Interconnection Facility
    • Part 1: General & Scope
    • Part 2: Protection & Communication
    • Part 3: Transformers & Forms
  • Annex 8: HV Switchgear Panels
  • Annex 9: Communication Requirements

MSDG.MU

Medium Scale Distributed Generation program for solar energy in Mauritius

Contact

📞 Telephone: 260 20 20

✉️ Email: contact@solarcenter.mu

Address

Solar Center
Royal Road, Port Louis
Mauritius
(At the back of the NTA)

Grid Code

Access the MSDG grid codes and technical requirements.

  • 50 kW - 200 kW
  • 200 kW - 2 MW

© 2025 MSDG.MU. All Rights Reserved.